| |
|
| 1 | 2 |
1 - Installation
2 - Finishing
|
| 2 - FINISHING |
| |
| Leave to dry for 24 h before applying mortar joint. |
| |
 |
|
 |
|
Once the finish has been applied clean the surface of the blocks. |
|
| |
 |
|
Always seal the joints in contact with the wall, floor and ceiling with silicon. |
|
 |
|
Glue a plastic, wooden or metal profiles for a neat finish.
The structure achieves maximum resistance after three weeks. |
|
Remark: finishing material is not included in the Installation Kit.
top
< back to General information |
| |
|
|